Welcome to RRPedia
Your Interactive Resource for EPA RRP Information

RRPedia logoLooking for accurate information about the EPA RRP rule?

RRPedia has been created by Shawn McCadden to help remodelers and others affected by the New EPA Renovation Repair and Painting Rule. 

Please read RRPedia Use and Contribution Information before using or contributing to RRPedia.

 


You Can Browse For RRP Topics By Using The Tags List To The Right

RRP Refresher: What is Vertical Containment and When is it Required?

Posted by Shawn McCadden on Sun, Apr 08, 2012 @ 12:07 PM

RRP Training Refresher: What is Vertical Containment and When is it Required?

RRPedia Refresher Key

 

It’s probably been a while since you took your RRP Certified Renovator Training Class.  This blog post is offered as a refresher topic to help you keep important details about the RRP rule top of mind when selling, estimating or performing RRP renovations.

 

What is Vertical Containment

ZipWall vertical containment

 

 

Vertical containment refers to a vertical barrier consisting of plastic sheeting or other impermeable material over scaffolding or a rigid frame, or an equivalent system of containing the work area. Vertical containment is required for some exterior renovations but it may be used on any interior or exterior renovation.

 

 

Is vertical containment required for interior jobs?

Interior vertical containment for RRPNo, the use of vertical containment is not required for interior jobs, but you can minimize the amount of floor containment needed by making use of vertical containment for interior projects.  Floor containment measures may stop at the edge of the vertical barrier when using a vertical containment system consisting of impermeable barriers that extend from the floor to the ceiling and are tightly sealed at joints with the floor, ceiling and walls.  One advantage of vertical containment in addition to the reduction of floor area to be covered is the potential reduction of the floor area and other areas that will need to be cleaned on completion of renovations

 

Is vertical containment required for exterior jobs?

exterior vertical containmentYes, vertical containment, or an equivalent system of containing the work area, is required for exterior jobs where the property line is within 10 feet of the area of paint disturbance. In addition, vertical containment can also be used to minimize the amount of ground containment needed for a project.  Ground containment measures may stop at the edge of the vertical barrier when using a vertical containment system.

 

 

Creative Use of Vertical Containment

Cutt down door for carpetConstructing vertical containment can also allow the contractor to create a sealed working space within a room where the dust can be completely contained to a limited and controlled area.  The space created is referred to as a “dust room”.  This can be extremely helpful in reducing containment and cleaning costs in other work areas if painted components are brought to this area to be repaired or modified, and are then cleaned before returning them to their original location.  One example of this might be cutting down interior doors after the installation of carpeting.  Another might be ripping down head stops when installing replacement windows.

 

Additional Resources

What is a "Dust Room" and why consider using one for EPA RRP work?

Zip Wall video about creating a variety of vertical barriers using their products

Topics: Definitions, Work Practices, RRP for Dummies, Containment Considerations