Guest Blog: New Understandings About The Required RRP Work Practices

Posted by Shawn McCadden on Tue, Mar 20, 2012 @ 05:00 AM

Making RRP Easier - New Understandings About RRP Work Practices

 

Dean Lovvorn, lead inspector

 

 

Guest Blogger:  Dean Lovvorn is a residential remodeler who has done numerous RRP projects.  He is also a Lead Inspector, Lead Risk Assessor and EPA RRP Renovator Instructor. 

This blog post is a follow-up to a previous RRPedia Guest Blog where Dean listed several differences between the work practices taught in the required Certified Renovator class and what he found is actually required in the RRP rule.

 

Making RRP Easier - New Understandings About RRP Work Practices

RRP ideas

 

 

Back in April 2010, I had an exterior remodeling job that was put on hold for a day because of heavy rains.  In my boredom, I decided to read the actual RRP law from start to finish.  I soon discovered that what I was taught in my 8 hour class and what was in the student manual wasn’t necessarily in the actual law itself.     

 

I was probably dozing off in the 8 hour renovator class, but after these discoveries, I began to clarify some new understandings.

  • On exterior containment set-ups, all I really needed to do was put plastic on the ground, be sure windows & doors were closed, cover any doors within 20 feet with plastic and put out a warning sign.  If there are no doors and/or windows within 20 feet, simply put plastic on the ground and a warning sign up.  Nothing else needed.
  • On interior containment set-ups, I just needed to do the same as the exterior (except 6 feet out from where I was working).  If there were no furniture/objects or ducts within the 6 foot area … I didn’t have to go any further.  Be sure to tape down the plastic on the floor.

Of course, if I was doing some really dusty work, I made the containment (work area) larger, but other than that, it was pretty quick, easy and simple if you were to ask me.

 

Following are some examples of how reading the actual law has helped me.

Siding Replacement

RRP Vertical containmentIn this example, I would place 3.5 mil plastic (from Home Depot), instead of the 6 mil plastic 10 feet out on the ground.  Then, I would make sure doors/windows were closed, put plastic over any doors and then put up the warning sign.  I would also run a plastic runner out to the dumpster and surround the ground around the dumpster with plastic.  Doing the containment this way, saves me from having to wrap, bag or HEPA vac the siding (or myself).  This is because I can dump the siding without ever going outside the containment area.

If exterior vertical containment is needed a simple solution (pictured to right) can be done.

Replacing Door Slabs

If my job is to replace 15 door slabs, I simply do this without following RRP.  This is because the only area I am disturbing on each door is the hinge area and since it falls under the Minor Repair and Maintenance Activities, RRP is not required.  This insight came from the FAQ section of the EPA web site.

Bathroom Remodel (Total Gut)

RRP Work Area Containment for a BathroomI can demo the tile, tub, shower, toilet and remove the demolition debris without doing any RRP.  After that has been done, I cover up ducts with plastic,  make sure windows are closed, close doors and cover with plastic, put up a warning sign and then cover the subfloor with plastic (6 feet out from where I will be working). 

I put the demoed walls, cabinets and trim into trash cans (with lids on top) and HEPA vac the outside of the trash cans (along with myself) before taking them out of the containment area.

Note:  If I’m lucky and there is an exit door (to the outside) close by … I could run plastic to the door, then outside to the dumpster.  This way, I wouldn’t need to worry about containing the demolition debris.

Normally, I do the final clean-up, visual inspection and cleaning verification after demolition; so that I can officially end RRP and let non-certified electricians/plumbers/sub-contractors into the work area.

 

Conclusion

Selling RRPIt very well could be that if you did a little homework by reading the actual law, you could reduce the cost of compliance on many jobs to less than 5%.  Few contractors will lose a job because they are higher by less than 5%.  Plus, with the cost less than 5%, I don’t even mention RRP to my clients during the estimation process anymore, which has helped to improve sales. 

 