MA RRP Sign In/Out Log Offered by Remodeling Consultant Shawn McCadden

 

Note: Massachusetts RRP Regulations NO LONGER REQUIRE Use of a Sign-in/out Log At Containment Areas

RRP SignOne of the differences between the EPA RRP Rule and the Massachusetts RRP Rule used to be that Massachusetts at one time required the Licensed Lead-Safe Renovation Contractor (firm) to maintain a sign in/out log, just like the one required for deleading contractors.  The log was intended to be signed by workers who enter and exit the contained work area during RRP renovations. 

Click here for more information.

RRP Sign in log

Use of the form is at your own risk!

Please fill out the form below to request the form. 

The form will be sent to you via e-mail.

Download MA RRP Sign In Log